Skip to content
YK Marine logo

Our work

Hulls before, hulls after

Work done at the yard, before and after.

Full antifouling job on a sailing yacht

Before: sailing yacht hull sanded back, no antifouling
After: the same yacht, new black antifouling and a yellow propeller
Left, the sanded hull; right, the new antifouling. Tabarka, 4 days of work.

Hull stripped back for osmosis treatment, then sealed

Before: sailing yacht hull stripped down to the laminate
After: the same yacht, new epoxy barrier coat and antifouling
Left, the hull stripped and checked; right, the new epoxy barrier coat and antifouling.

On the hard this season

  • Large motor yacht under scaffolding during painting work
    Large yacht under scaffolding. Painting.
  • Stainless steel stern gantry with solar panels on a catamaran
    Stainless stern gantry and solar panels. Stainless steel and welding.
  • Catamaran hauled out next to the travel hoist
    Catamaran hauled out, travel hoist behind. Boat handling.
  • Propeller, shaft bracket and rudder under a motorboat out of the water
    Propellers and rudders serviced out of the water. Marine engineering.
  • Beige bimini and cockpit cover on a motorboat
    Made-to-measure bimini and cockpit cover. Canvas work.
  • Fitting a rigid solar panel on the hardtop of a motorboat
    Solar panels on a hardtop. Onboard power.
  • Catamaran lifted by the travel hoist over the haul-out bay, seen from the bows, slings under both hulls
    Catamaran haul-out with the travel hoist. Boat handling.
  • Worker hand-sanding the old antifouling on a catamaran
    Sanding off the old antifouling. Hull cleaning and antifouling.

Your boat deserves the same “after” photo

Quick quote on WhatsApp, no obligation.

CallQuick quote